Site Regulations  
   
Home
 
Login  
About Hospital Safety Center  
Contact Us
 
Sitemap
 
Subscribe  
       Free Resources
Hospital Safety Connection
E-Newsletter

 
Important Safety Websites  
Mac's Safety Space  
       Safety Center Members
Briefings on Hospital Safety  
Special Reports  
Healthcare Security Alert  
Safety Talk  
       Platinum Members
Regulatory Compliance Database  
Risk Assessment Workstations  
 
Hazard Vulnerability Analysis
Interim Life Safety Measures
Infection Control Risk Assessment
 
Forms and Checklists Library  
       Consulting
Greeley Hospital Safety Institute  

 

 

     

Mac’s Safety Space: Breaker, breaker . . .

EMAIL THIS STORY | PRINT THIS STORY | SUBSCRIBE | ARCHIVES

January 26, 2012

Recently I received a question from a colleague regarding a survey finding an RFI under EC.02.05.01, performance element numero 7, which requires hospitals to map the distribution of its utility systems. The nature of the finding was that there was an electrical panel in which the panel schedule did not accurately reflect the status of the breakers contained therein.

My guess is that there was a breaker labeled as a “spare” that was in the “on” position, which is a pretty common finding if one should choose to look for such a condition. At any rate, the finding went on to outline that staff were unaware of the last time the mapping of the electrical distribution was verified. The question thus became: How often do we need to be verifying panel schedules, since the standard doesn’t specify and there is no supporting FAQ, etc., to provide guidance.

Now, first, I don’t know that this would be the most appropriate place to cite this condition; my preference would be for EP #8, which requires the labeling of utility systems controls to facilitate partial or complete emergency shutdowns, but I digress. Strictly speaking, any time any work is done in an electrical panel, the panel schedule should be verified for accuracy, which means that any breaker that is in the “on” position should be identified as such on the panel schedule. This is not specifically a Joint Commission requirement, but I think that we can agree that the concept, once one settles the matter as a function of logic and appropriate risk management behavior, “lives” in NFPA 70 the National Electrical Code®.

Read more.




Subscribe Now!
Sign up for our free e-newsletter
Analyzing the Hospital Life Safety Survey

This book by former Joint Commission life safety surveyor Brad Keyes, CHSP, provides a practical, strategic approach to the life safety survey process. Keyes offers a room-by-room, floor-by-floor analysis of the life safety measures you need to have in place to avoid costly citations. He simplifies confusing Joint Commission standards and CMS requirements and reveals what you should be focusing on to pass your next life safety survey.